La Rosetta, Brentford, Before. They required external heaters to be installed
La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches
Energy efficient infrared external heater
Push button time lag switch
LED strip lighting for kitchen extension
Kitchen extension wall lights, Before
Kitchen feature lights, After
Flush mounted extrator hood with LED's, Before
Flush mounted ceiling extractor hood, After
Double oven and fridge unit, Before
Double oven and fridge unit, After
Consumer Unit first fix, Before
Consumer Unit, After
Shop Before
Shop After
Black conduit for new power supply
Power for electric canopy
Switch to operate canopy in a IP rated enclosure
Addition external double socket
Garden lighting for the Viaduct Pub
Feature lights with PIR sensor
Black conduit for new external lights
Warm white LED lamps
Made to measure under cabinet lighting
LED strip in white aluminium profile
Frosted defuser to soften light
Touch sensor to operate lights
Shower room with limited spaced, recessed LED strip and profile
12 volt Tooth brush charger in chrome finish
Ideal lighting solution of a limited area
Foundation for new LED pillar lights
1 meter long, 6mm iron bar for support
SWA cable used for supply
Cavity block used as base
Cement with aggregate for soild base
LED pillar with 180 degree rotation
Base painted with black masonry paint
6 x LED pillar lights for additional security
Contemporary LED pillar
Client required consumer unit to be relocated
Consumer unit not to current standards
18th edition consumer unit and meter relocated
RCBOs installed for better protection
Space ready for new boiler to be installed
existing cables re-routed and contained in high impact trunking
Client required cooker extractor hood
Stainless steel extractor hood installed with fused spur
Second flat also required extractor hood
Cables run in high impact trunking with fused spur
Both jobs completed, client extremely pleased with finished work
EV charger commissioned and tested
Tesla 3rd Generation EV Charger
Base unit installed
Isolator and consumer unit
Surge protection device
La Rosetta, Brentford, Before. They required external heaters to be installed
La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches
Energy efficient infrared external heater
Push button time lag switch
LED strip lighting for kitchen extension
Kitchen extension wall lights, Before
Kitchen feature lights, After
Flush mounted extrator hood with LED's, Before
Flush mounted ceiling extractor hood, After
Double oven and fridge unit, Before
Double oven and fridge unit, After
Consumer Unit first fix, Before
Consumer Unit, After
Shop Before
Shop After
Black conduit for new power supply
Power for electric canopy
Switch to operate canopy in a IP rated enclosure
Addition external double socket
Garden lighting for the Viaduct Pub
Feature lights with PIR sensor
Black conduit for new external lights
Warm white LED lamps
Made to measure under cabinet lighting
LED strip in white aluminium profile
Frosted defuser to soften light
Touch sensor to operate lights
Shower room with limited spaced, recessed LED strip and profile
12 volt Tooth brush charger in chrome finish
Ideal lighting solution of a limited area
Foundation for new LED pillar lights
1 meter long, 6mm iron bar for support
SWA cable used for supply
Cavity block used as base
Cement with aggregate for soild base
LED pillar with 180 degree rotation
Base painted with black masonry paint
6 x LED pillar lights for additional security
Contemporary LED pillar
Client required consumer unit to be relocated
Consumer unit not to current standards
18th edition consumer unit and meter relocated
RCBOs installed for better protection
Space ready for new boiler to be installed
existing cables re-routed and contained in high impact trunking
Client required cooker extractor hood
Stainless steel extractor hood installed with fused spur
Second flat also required extractor hood
Cables run in high impact trunking with fused spur
Both jobs completed, client extremely pleased with finished work
EV charger commissioned and tested
Tesla 3rd Generation EV Charger
Base unit installed
Isolator and consumer unit
Surge protection device
La Rosetta, Brentford, Before. They required external heaters to be installed
La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches
Energy efficient infrared external heater
Push button time lag switch
LED strip lighting for kitchen extension
Kitchen extension wall lights, Before
Kitchen feature lights, After
Flush mounted extrator hood with LED's, Before
Flush mounted ceiling extractor hood, After
Double oven and fridge unit, Before
Double oven and fridge unit, After
Consumer Unit first fix, Before
Consumer Unit, After
Shop Before
Shop After
Black conduit for new power supply
Power for electric canopy
Switch to operate canopy in a IP rated enclosure
Addition external double socket
Garden lighting for the Viaduct Pub
Feature lights with PIR sensor
Black conduit for new external lights
Warm white LED lamps
Made to measure under cabinet lighting
LED strip in white aluminium profile
Frosted defuser to soften light
Touch sensor to operate lights
Shower room with limited spaced, recessed LED strip and profile
12 volt Tooth brush charger in chrome finish
Ideal lighting solution of a limited area
Foundation for new LED pillar lights
1 meter long, 6mm iron bar for support
SWA cable used for supply
Cavity block used as base
Cement with aggregate for soild base
LED pillar with 180 degree rotation
Base painted with black masonry paint
6 x LED pillar lights for additional security
Contemporary LED pillar
Client required consumer unit to be relocated
Consumer unit not to current standards
18th edition consumer unit and meter relocated
RCBOs installed for better protection
Space ready for new boiler to be installed
existing cables re-routed and contained in high impact trunking
Client required cooker extractor hood
Stainless steel extractor hood installed with fused spur
Second flat also required extractor hood
Cables run in high impact trunking with fused spur
Both jobs completed, client extremely pleased with finished work
EV charger commissioned and tested
Tesla 3rd Generation EV Charger
Base unit installed
Isolator and consumer unit
Surge protection device