View fullsize La Rosetta, Brentford, Before. They required external heaters to be installed View fullsize La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches View fullsize Energy efficient infrared external heater View fullsize Push button time lag switch View fullsize LED strip lighting for kitchen extension View fullsize Kitchen extension wall lights, Before View fullsize Kitchen feature lights, After View fullsize Flush mounted extrator hood with LED's, Before View fullsize Flush mounted ceiling extractor hood, After View fullsize Double oven and fridge unit, Before View fullsize Double oven and fridge unit, After View fullsize Consumer Unit first fix, Before View fullsize Consumer Unit, After View fullsize Shop Before View fullsize Shop After View fullsize Black conduit for new power supply View fullsize Power for electric canopy View fullsize Switch to operate canopy in a IP rated enclosure View fullsize Addition external double socket View fullsize Garden lighting for the Viaduct Pub View fullsize View fullsize Feature lights with PIR sensor View fullsize Black conduit for new external lights View fullsize Warm white LED lamps View fullsize Made to measure under cabinet lighting View fullsize LED strip in white aluminium profile View fullsize Frosted defuser to soften light View fullsize Touch sensor to operate lights View fullsize Shower room with limited spaced, recessed LED strip and profile View fullsize 12 volt Tooth brush charger in chrome finish View fullsize Ideal lighting solution of a limited area View fullsize Foundation for new LED pillar lights View fullsize 1 meter long, 6mm iron bar for support View fullsize SWA cable used for supply View fullsize Cavity block used as base View fullsize Cement with aggregate for soild base View fullsize LED pillar with 180 degree rotation View fullsize Base painted with black masonry paint View fullsize 6 x LED pillar lights for additional security View fullsize Contemporary LED pillar View fullsize Client required consumer unit to be relocated View fullsize Consumer unit not to current standards View fullsize 18th edition consumer unit and meter relocated View fullsize RCBOs installed for better protection View fullsize Space ready for new boiler to be installed View fullsize existing cables re-routed and contained in high impact trunking View fullsize Client required cooker extractor hood View fullsize Stainless steel extractor hood installed with fused spur View fullsize Second flat also required extractor hood View fullsize Cables run in high impact trunking with fused spur View fullsize Both jobs completed, client extremely pleased with finished work View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize EV charger commissioned and tested View fullsize Tesla 3rd Generation EV Charger View fullsize Base unit installed View fullsize Isolator and consumer unit View fullsize Surge protection device View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize View fullsize La Rosetta, Brentford, Before. They required external heaters to be installed La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches Energy efficient infrared external heater Push button time lag switch LED strip lighting for kitchen extension Kitchen extension wall lights, Before Kitchen feature lights, After Flush mounted extrator hood with LED's, Before Flush mounted ceiling extractor hood, After Double oven and fridge unit, Before Double oven and fridge unit, After Consumer Unit first fix, Before Consumer Unit, After Shop Before Shop After Black conduit for new power supply Power for electric canopy Switch to operate canopy in a IP rated enclosure Addition external double socket Garden lighting for the Viaduct Pub Feature lights with PIR sensor Black conduit for new external lights Warm white LED lamps Made to measure under cabinet lighting LED strip in white aluminium profile Frosted defuser to soften light Touch sensor to operate lights Shower room with limited spaced, recessed LED strip and profile 12 volt Tooth brush charger in chrome finish Ideal lighting solution of a limited area Foundation for new LED pillar lights 1 meter long, 6mm iron bar for support SWA cable used for supply Cavity block used as base Cement with aggregate for soild base LED pillar with 180 degree rotation Base painted with black masonry paint 6 x LED pillar lights for additional security Contemporary LED pillar Client required consumer unit to be relocated Consumer unit not to current standards 18th edition consumer unit and meter relocated RCBOs installed for better protection Space ready for new boiler to be installed existing cables re-routed and contained in high impact trunking Client required cooker extractor hood Stainless steel extractor hood installed with fused spur Second flat also required extractor hood Cables run in high impact trunking with fused spur Both jobs completed, client extremely pleased with finished work EV charger commissioned and tested Tesla 3rd Generation EV Charger Base unit installed Isolator and consumer unit Surge protection device La Rosetta, Brentford, Before. They required external heaters to be installed La Rosetta, Brentford, After, 4 x 3 Kw infrared external heaters with time lag switches Energy efficient infrared external heater Push button time lag switch LED strip lighting for kitchen extension Kitchen extension wall lights, Before Kitchen feature lights, After Flush mounted extrator hood with LED's, Before Flush mounted ceiling extractor hood, After Double oven and fridge unit, Before Double oven and fridge unit, After Consumer Unit first fix, Before Consumer Unit, After Shop Before Shop After Black conduit for new power supply Power for electric canopy Switch to operate canopy in a IP rated enclosure Addition external double socket Garden lighting for the Viaduct Pub Feature lights with PIR sensor Black conduit for new external lights Warm white LED lamps Made to measure under cabinet lighting LED strip in white aluminium profile Frosted defuser to soften light Touch sensor to operate lights Shower room with limited spaced, recessed LED strip and profile 12 volt Tooth brush charger in chrome finish Ideal lighting solution of a limited area Foundation for new LED pillar lights 1 meter long, 6mm iron bar for support SWA cable used for supply Cavity block used as base Cement with aggregate for soild base LED pillar with 180 degree rotation Base painted with black masonry paint 6 x LED pillar lights for additional security Contemporary LED pillar Client required consumer unit to be relocated Consumer unit not to current standards 18th edition consumer unit and meter relocated RCBOs installed for better protection Space ready for new boiler to be installed existing cables re-routed and contained in high impact trunking Client required cooker extractor hood Stainless steel extractor hood installed with fused spur Second flat also required extractor hood Cables run in high impact trunking with fused spur Both jobs completed, client extremely pleased with finished work EV charger commissioned and tested Tesla 3rd Generation EV Charger Base unit installed Isolator and consumer unit Surge protection device